📦 ISPM-15 crated ⏱ 7–10 day lead time 🛡 12-month warranty 🔧 7-year spares commitment 💬 WhatsApp +86 134 2309 4186
Incoterms 2020

Six terms — pick the one that fits your supply chain

We will quote more than one term so you can compare landed cost properly rather than guessing.

TermNameHandover pointWhat it means for you
EXWEx WorksShenzhen (Yantian / Shekou)Buyer collects from our facility and handles all export formalities. Suitable only if you already have a Chinese freight agent.
FOBFree On BoardShenzhen / Yantian / ShekouOur default term. We deliver to the port and clear export; you arrange and pay the ocean freight and insurance. Best value for buyers with their own forwarder.
CIFCost, Insurance & FreightYour destination portWe book the freight and insure the cargo to your port. Simple for first orders when you do not yet have a forwarder relationship.
CFRCost & FreightYour destination portAs CIF but without insurance, if you prefer to place cover under your own open policy.
DAPDelivered At PlaceYour named addressWe deliver to your door; you handle import clearance and duties. Popular with EU and US buyers who have a customs broker.
DDPDelivered Duty PaidYour named addressThe full door-to-door service including duties and import clearance. We quote this for established markets where we have a customs partner.
Getting it there

Four shipping routes, each with a job

✈️ Air freight

  • 4–8 days door to door for single units and small orders
  • Best fit for the 2.9 kg TC-50P and one-off lab units
  • Battery models need UN38.3 paperwork — we supply it
  • Typical cost: US$260–480 for one 20 kg machine to EU / US

🚢 Sea freight (LCL)

  • 22–38 days depending on destination port and routing
  • Economic from roughly 2 machines upward
  • Wooden crate on a pallet, moisture barrier and desiccant included
  • We can consolidate with our other shipments if you are flexible on dates

📦 Sea freight (FCL)

  • For automated line orders and multi-machine projects
  • 20 ft container typically carries 12–20 benchtop machines
  • Machines braced inside the container and photographed before sealing
  • Best per-unit freight cost; requires more planning lead time

🚚 Express courier

  • 3–5 days for spares, electrodes, tooling and documents only
  • DHL / FedEx / UPS account shipping on your number if preferred
  • Ideal for urgent carbon electrodes and consumable kits
Packing

How a machine is packed

Wooden crate

Heat-treated (ISPM 15) plywood crate for every machine. Marked with handling symbols and your PO / SKU references.

Machine wrapping

Stretch film, foam corner blocks and a desiccant sachet inside a moisture barrier bag for sea freight.

Accessories box

Foot switch, electrodes, leads, goggles, fuses and the manual are packed in a labelled inner box — nothing loose.

Documentation

Packing list, test certificate, Declaration of Conformity and the operation manual (EN, plus your target language on request).

Photo record

We photograph the packed crate and the loaded container and send the images before dispatch.

Labelling

Shipping marks to your requirement — PO number, carton count, gross weight, country of origin.

After the sale

Warranty & after-sales commitments

12 months — Limited warranty

From the date of shipment, covering manufacturing defects in the power supply, capacitor bank, control board and wiring harness.

7 years — Spare parts availability

We hold — and commit to hold — spare capacitor banks, control boards, electrodes and gas fittings for seven years after the last production run of each model.

48 hours — Technical response

Written technical response to any service enquiry within two working days, in English, Spanish, German, French, Japanese or Chinese.

Factory training — Free for distributor partners

On-site or remote product training for your engineers and sales team. Travel costs quoted separately for on-site visits.

Remote diagnosis — Guided troubleshooting

Structured fault-finding checklists plus video call support to identify a failed module without shipping the machine back.

Module swap — Spare board programme

For distributors we can supply exchange control boards and capacitor banks up front, so you repair on site instead of waiting on a return shipment.

Payment

How you can pay

T/T (wire transfer)

30 % deposit, 70 % before shipment — our standard term for all first orders.

Letter of Credit

L/C at sight accepted for orders above US$20,000, issued through a prime bank.

Trade Assurance

Escrow-style protection for buyers who prefer a platform-mediated payment.

PayPal / card

Available for spares, sample orders and trial units below US$2,000.

NET 30 / 45

Open account terms available to established customers after two completed orders.

Purchase order

We accept corporate POs from registered businesses; a proforma invoice is issued first.

Common questions

Shipping, warranty and payment questions

How long is the lead time?

Standard benchtop machines ship 7–10 working days after deposit. Portable and laboratory units ship 5–8 days. Heavy stud units 10–15 days. Automated lines and custom tooling 4–8 weeks. Lead time starts when the deposit clears, not when you enquire.

Can you ship to my country?

We ship worldwide. We already export to North America, the EU and UK, Japan, Southeast Asia, the Middle East, Latin America, Australia and South Africa. If your destination needs a specific declaration we will tell you before you order rather than surprise you afterwards.

What Incoterm should I choose?

FOB if you have your own freight forwarder — it is usually the cheapest. CIF for a first order when you want us to handle the freight. DDP for door-to-door delivery with duties included. We will quote more than one term so you can compare.

Do you offer a warranty?

Yes — 12 months limited warranty from shipment date on the power supply, capacitor bank, control board and wiring harness. Consumables such as carbon electrodes and ceramic ferrules are excluded, as is damage from misuse or unauthorised modification.

What happens if a machine fails in service?

Send us the symptoms with photographs or a short video and we respond within 48 hours with a diagnosis. Most faults are a failed control board or capacitor bank, both of which are modular. We ship the replacement module by express courier and guide your technician through the swap, or replace under warranty if it is a covered defect.

Can I get spare parts?

Yes, and we commit to holding them for seven years after a model ends production. Stock items include capacitor banks, control boards, carbon electrodes, ceramic ferrules, gas fittings and foot switches. We recommend every buyer keeps one spare electrode set on the shelf.

What are the payment terms?

30 % deposit with the order, 70 % before shipment is standard. L/C at sight for orders above US$20,000. PayPal or card for spares under US$2,000. NET 30 or 45 for established customers after two completed orders.

Do you accept returns?

If a machine arrives damaged or does not match its specification, tell us within 14 days with photographs and we will repair, replace or refund at our cost. Because every machine is configured and calibrated to order we do not accept change-of-mind returns, which is why we encourage a paid sample order or a sample weld test first.

Chat on WhatsApp