1,800–2,400pcs / hour output
Up to 5welding stations
1.5 sper-station cycle time
4.8 kWtotal line power
Line architecture

Up to five stations — typically configured as…

  1. S1

    Loading & stripping

    Auto strip & orient. Servo-driven wire feed. Cycle time: 1.5 s.

  2. S2

    Argon purge

    Pre-weld purge + nozzle positioning. Argon pressure 0.6–0.9 MPa.

  3. S3

    CD weld

    Capacitive discharge < 8 ms. 4-zone rotary indexer keeps every station tight to spec.

  4. S4

    Vision QC (optional)

    2-MP camera + AI bead classifier. Rejects mis-aligned or porous joints.

  5. S5

    Unload & label

    Servo unload. Optional inkjet lot stamp. Conveyor to test cell or pack-out.

Specifications

TC-300A — full datasheet

Line
Configuration3 / 4 / 5 stations (modular)
Footprint (5-station)200 × 110 × 160 cm
Total weight280 kg
Indexer4-zone servo rotary, 1.5 s/station
Throughput1,800–2,400 pcs/hour
Welding
TechCapacitive discharge + argon
Single-strand0.20 – 3.0 mm
Stranded30 – 14 AWG
TC typesK · J · T · E · N · R · S · B
Argon0.6 – 0.9 MPa · dedicated manifold
Control
ControllerPLC (Siemens S7-1200 / Allen-Bradley MicroLogix)
HMI10" capacitive touch, multi-language
Recipes100+ named programs · role-based access
LoggingUSB, Ethernet (MQTT / OPC-UA optional)
Compliance
Quality systemISO 9001:2015
SafetyCat-3 / PL d two-hand + light curtain
CE / RoHS / ULUL-listed as standard; CE / RoHS bundled
CalibrationISO 17025 per unit
Configure

Pick the options that match your line

OptionBenefitLead-time addition
Vision QC (4-MP camera + AI)Auto-reject < 1 % true defect rate+ 2 weeks
Inline 4-wire resistance testDetect junction cold joints to ≤ 50 µΩ+ 1 week
Inkjet lot stampTrace every probe to a recipe + line+ 1 week
Strip & twist pre-stationSkip manual prep, integrate upstream+ 2 weeks
CE + UL dual-packShip to EU & US on the same line+ 1 week
Spare-parts kit (5 yr)Hose, nozzles, electrodes, valve+ 0 weeks

Talk to a TC-300A engineer

The TC-300A is custom-configured per site. We start with a 30-min application call, then deliver a line drawing within 5 working days.

  • 3 / 4 / 5 station configurations
  • Typical lead time: 6–9 weeks from PO
  • PI turn-key installation available globally
  • PPAP / IQ / OQ / PQ documentation for automotive